2009 News Releases Archive

News Archive

Highway Commission awards main span contract (359 KB)December 30, 2009

The Missouri Highway and Transportation Commission this morning awarded a $229.5 million contract to construct the main span of the Mississippi River Bridge to the joint venture of Massman/Traylor/Alberici.

MHTC holds meeting to decide on main span contract (357 KB)December 29, 2009

The Missouri Highway and Transportation Commission meets December 30, 2009 to decide whether or not to award the main span contract for the Mississippi River Bridge.

IDOT, MODOT advertise main span contract(359 KB)October 30, 2009

The Missouri Department of Transportation (MoDOT) and the Illinois Department of Transportation (IDOT) have advertised the contract to construct the main span of the Mississippi River Bridge.

November 5 pre-bid meeting for main span(17 KB)September 30, 2009

The meeting originally scheduled for Sept. 29 has been rescheduled for Nov. 5 from 9:30 to 11 a.m. in the Missouri Department of Transportation District Office in Chesterfield. Directions to the office.

MoDOT postpones MRB advertisement, bid opening(359 KB)September 15 , 2009

The Mississippi River Bridge Team has postponed the advertisement for the main span of the Mississippi River Bridge project until the end of October; the bid opening will be at the end of November.

Press Release on prequalified bridge construction teams(359 KB)August 25, 2009

The Mississippi River Bridge design team has prequalified four contractor teams to
bid on the cable-stay portion of the new bridge between East St. Louis, Ill., and St. Louis, Mo.

Press Release on Business Networking Forum Meetings(358 KB)July 23, 2009

Press Release on Public Meeting to discuss dual DBE/MBE goals(76 KB)July 1, 2009

Press Release on MHTC awards first construction contract on river bridge(52 KB)June 4, 2009

Press Release on St. Louis, Madison Avenue bridge public meeting(50 KB)April 2, 2009

Press Release on prequalified bridge construction teams (50 KB)December 5, 2008

Press Release on Missouri River drilling beginning for design(358 KB)September 3, 2008